The part of the remodel that has to be right before anything gets covered
Tile, cabinets, and paint can be redone. Drainage under a slab cannot, not without breaking the floor you just finished. We do the plumbing side of kitchen, bathroom, and whole-home remodels — relocations, rough-in, trim, permit and inspection — sequenced so the trades after us are never waiting on us.
When to call us
- Moving a toilet, sink, shower, or tub to a different spot
- Opening up a kitchen and taking the sink to an island
- Converting a tub to a walk-in shower
- A whole-home renovation where the layout changes
- Adding a bathroom in a space that never had one
- A remodel where the existing pipe turned out to be galvanized or cast iron
Need this today?
A person answers Monday to Friday, 7:00a–6:00p, and you get the price before any work starts.
(830) 816-0665What the job actually involves
-
01
Walk it before the drawings are final
The cheapest hour on a remodel is the one spent before demolition, standing in the room with the plan. Where the existing drain runs, which way the joists span, and how much fall is available between the fixture and the stack decide what is possible. We would rather tell you a layout is expensive while it is still a drawing than after the cabinets are ordered.
-
02
Demolition and rough-in
Supply and drain lines relocated to the new layout, vented properly, and pressure-tested. On slab homes a fixture that moves more than a little means cutting and re-pouring concrete, which is the single biggest cost driver in the job and the one most often left out of a cheap bid.
-
03
Rough-in inspection before anything is covered
We pull the permit under our RMP license and meet the inspector on site. This is the point of no return — once drywall and tile go on, a failed rough-in is a demolition job. Nothing gets covered until it has passed.
-
04
Trim-out and final
Fixtures, valves, and trim set after the finishes are in, then a final inspection. We come back at the end of the job rather than trying to set finish plumbing around a tile setter who is still working.
Why this looks different here
Two Central Texas patterns decide most remodel budgets. The first is slab-on-grade construction: almost everything built here since the 1960s sits on a slab, so relocating a drain means cutting concrete rather than working between joists, and the difference between a fixture that stays put and one that moves four feet can be a third of the plumbing cost. The second is what is already in the wall. Homes inside Loop 410 and in central Austin routinely still have cast iron drainage and galvanized supply, and a remodel is the one moment when replacing it is cheap — the wall is already open. Finding it after the tile is on is how a remodel goes over budget.
What drives the price
- Whether fixtures stay on their existing drain or move to a new one
- Slab versus pier-and-beam — concrete cutting changes the cost materially
- Whether the existing pipe is serviceable or has to be replaced while it is open
- How much new venting the relocated fixtures need
- Permit and inspection fees for your jurisdiction
Every option is quoted flat-rate and approved by you before work begins.
Straight answers
Do you do new construction?
Not yet. We are deliberately staying with remodels, renovations, and service work until we have the plumbers to take on new construction without letting existing customers down. It is a capacity decision rather than a capability one, and we would rather say so than take the job and be late on it.
Can I move my toilet or sink anywhere I want?
Within limits set by physics rather than by us. Drain lines run on gravity and need roughly a quarter inch of fall per foot, and every fixture has to stay within a set distance of a vent. Most layout ideas work; the ones that do not usually fail on fall or on venting, and it is much better to find that out at the drawing stage.
Do you work directly with my contractor?
Either way. We take remodel plumbing as a subcontractor to a general contractor, and we also work directly for homeowners running their own project. If you are running it yourself, we will tell you what has to happen before and after us so the schedule holds.
Who pulls the permit?
We do, under our Texas RMP license, for the plumbing scope. Pulling a permit in the homeowner’s name for work a licensed plumber is doing is a common way for a cheap bid to look cheap, and it leaves the liability with you.
Related services
Fixtures, Toilets & Disposals
Faucets, toilets, tubs, showers, disposals, and the supply stops behind them.
Read moreRepiping & Water Lines
When the pinholes keep coming, replacing the system costs less than chasing it.
Read moreGas Lines
Fuel gas is the one area of plumbing where there is no acceptable shortcut.
Read moreRemodel & Renovation across both metros
Get it looked at properly.
Call and talk to a person, or book a visit online. Either way you see the price before we start.
